Skip to main content
Search...

Clonmel

IDA Ireland /Tipperary County Council Partnership - Advance Planning for c. 10,000 m² (c. 107,000 ft²) Building. Technology/ manufacturing space of c. 6,480 m² (69,750 ft²) with roller shutter doors to yard. Ancillary office space over two floors will be fitted out to include raised access floors, suspended ceilings, lighting, heating, air conditioning, finished toilets and common areas- TBC Surface car parking for 240 cars with EV charging terminals and cycle parking onsite

Clonmel Advance Building Solution

Building details

  • Advance Building Solution of c. 10,000 m²(107,000 ft²) on a site area of approx. 3.4 hectares (approx. 8.4 acres)
  • Technology/ manufacturing space of c. 6,480 m²(69,750 ft²) with roller shutter doors to yard
  • Ancillary office space overtwo floors will be fitted outto include raised access floors, suspended ceilings, lighting, heating, air conditioning,finished toilets and common areas- TBC
  • Surface car parking for 240 cars with EV charging terminals and cycle parking onsite

Sustainability

  • Designed to achieve LEEDCS accreditation and nZEB compliance

Advance Building Solution of c. 10,000 m²(107,000 ft²) on a site area of approx. 3.4 hectares

Base Specifications

Attribute
Production Space
Production Space
c. 69,750
SQF
Ground Floor Office
Ground Floor Office
c.12,346
SQF
First Floor Office
First Floor Office
c,12.841
SQF
Total Floor Area
Total Floor Area
c.107,000
SQF